Chan F.T.S, Chung S.H., Chan P.L.Y. 2006 Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems. International Journal of Production Research 44(3) 523-543.
Chan, F.T.S., Chung, S.H., Chan, L.Y., Finke, G., Tiwari, M.K. 2006. Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach. Robotics and Computer-Integrated Manufacturing 22 493–504.
Chen, Z.-L. and Pundoor, G. 2006 Order assignment and scheduling in a supply chain. Operations Research 54 555–572.
Chung, S.H., et al. 2009 A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling. Engineering Applications of Artificial Intellegence
DiNatale, M. and Stankovic, J.A. 1995 Applicability of simulated annealing methods to real-time
scheduling and jitter control. In Proceedings of the 16th IEE Real-Time Systems Symposium 190–199.
Herroelen, W.S. 2007. Project and production scheduling. Acco, Leuven
Houtekier, S. 2004. Plannings- en lay-out problematiek bij Echo nv. Eindverhandeling aan de faculteit Economie en Bedrijfswetenschappen.
Jia, H.Z., Nee, A.Y.C., Fuh, J.Y.H., Zhang, Y.F. 2003. A modified genetic algorithm for distributed scheduling problems. Journal of Intelligent Manufacturing 14 351–362.
Jia, H.Z., Fuh, J.Y.H., Nee, A.Y.C., Zhang, Y.F. 2002. Web-based multi-functional scheduling system for a distributed manufacturing environment. Concurrent Engineering: Research and Applications 10(1) 27–39.
Leung, S.C.H., Wu, Y., Lai, K.K. 2003. Multi-site aggregate production planning with multiple objectives: A goal programming approach. Production Planning and Control 14(5) 425–436.